BIDS homeBIDS aboutBIDS buyer infoBIDS Subscriber InfoBIDS Franchising infoBIDS Free BrowsingBIDS Oil and GasBIDS Terms and ConditionsBIDS loginBIDS tendering






Kiewit Kvaerner Contractors Closed EOI Details

Reference Number: SC761N
Close Date: 2014-01-06
Issue Date: 2013-12-22

Tender Information



Contact: (0)-

REQUEST FOR EXPRESSION OF INTEREST (EOI)

HEBRON GBS Project - Bull Arm
BIDS Categories: 9466
Issue Date: December 20, 2013
Closing Date: January 06, 2014

PACKAGE NUMBER: SC761N TITLE: Prefabrication of Carbon Steel J-Tube & Riser Pipe Stabilizers Subcomponents


PACKAGE NUMBER: SC761O TITLE: Prefabrication of Carbon Steel Conductor Guide Tube Stabilizers Subcomponents


GENERAL
Kiewit-Kvaerner Contractors (KKC) hereby invites interested parties to submit an Expression of Interest (EOI) related to the future issuance of Requests for Qualifications and subsequent Requests for Tender for the following Scope of Work/Supply/Services package in connection with KKC’s EPC services for the Hebron GBS Project in Newfoundland and Labrador, Canada.
SCOPE OF WORK

The Scope of Work includes the prefabrication of pipe and conductor guide tube support stabilizer subcomponents for each of four (4) each Main Guide Decks and Conductor Guide Frames. The total quantity of subcomponent prefabrication for all four (4) decks is estimated to be
70-metric tonnes.

Work for J-Tube and Riser pipe alignment stabilizers generally includes:
• Prefabrication (cut, prep, fit, weld) of carbon steel plate
• surface preparation and coating (painting)

Work for Conductor Guide Tube alignment stabilizers generally includes:
• Rolling of 10mm carbon steel plate to 463mm radius
• prefabrication (cut, prep, fit, weld) of rolled plate and plate steel
• surface preparation and coating (painting)



Prefabrication Work Orders will be awarded in two Phases. Phase 1 work for EL50m and 74m stabilizers, estimated to be
600EA and
35 MT, and is anticipated to be awarded 15-Feb-2014 and shall be completed 1-Jun-2014. Phase 2 stabilizers at EL98m and 118m, is similar (
35 MT) and is anticipated to be awarded in 3Q/4Q-2014.

All raw/bulk steel material to be free-issued by KKC. All transportation of bulk materials and completed subcomponents by KKC.

This prefabricated subcomponent package will be bid on international competitive basis. Invited fabricators must have experience in offshore, subsea, or heavy steel fabrication, and specifically experience welding grade S355 CV1 and CV2 steel material. Invited NL and other Canadian fabricators will be selected based on previous prequalification under package SC761. In addition, certain select and prequalified fabricators under packages SC937, SC606, and SC603 may be invited to bid.
If additional project information is required, please visit the Hebron Project website at www.hebronproject.com or the KKC website at www.kkc-gbs.com.
BENEFITS COMMITMENTS
Kiewit-Kvaerner Contractors is committed to providing full and fair opportunities to commercially competitive Canadian companies with first consideration given to those from Newfoundland and Labrador. At the Pre-Qualification and ITT stages, companies will be required to complete Canada/Newfoundland & Labrador Benefits questionnaires to acknowledge their willingness to comply with the Hebron Benefits Agreement.

EQUAL OPPORTUNITY
KKC is an equal opportunity employer and as such supports diversity in the workplace. Successful suppliers and subcontractors to KKC will be required to undertake a commitment to support diversity in execution of work on the Hebron Project.
A copy of the Hebron benefits agreement can be found on the KKC and Hebron Project websites.
RESPONSES AND SUBMISSION REQUIREMENTS
Applicant(s) must clearly identify the procurement package code assigned to this EOI in their responses. Applicants’ EOI submissions must provide the complete company name and address and the names, titles and telephone numbers of two contact persons.
It is important to note that the EOI phase will be used to identify candidates that may be invited to participate in the prequalification process. Participation in this EOI process, including any statements or representations, whether oral or written between KKC and interested applicants, shall not create or be deemed to create, any binding legal relationship or contract.


EXTERNAL POSTINGS
To ensure all potential supply communities are informed of upcoming opportunities KKC will be posting all EOI’s on BIDS.ca and NOIA.ca. There is no formal document required to submit an EOI to KKC however in all email submissions we ask that the title of the email follow the below naming convention.
All information, correspondence and submittals must be in English and the subject line of the email must be formatted as follows: EOI Submission - Package Number - Package Title
Please send EOIs via email to the following address: eoi@kkc-gbs.com

If you have any questions regarding this announcement, please contact:

Subcontract Specialist: David Smith

Subcontract Specialist Email: david.a.smith@kkc-gbs.com
KIEWIT-KVAERNER CONTRACTORS
A Peter Kiewit Infrastructure Co. / Kvaerner Partnership

Item Quantity Unit Code Description

1 1 N/A 9466 Vehicle Sales/Leasing