BIDS homeBIDS aboutBIDS buyer infoBIDS Subscriber InfoBIDS Franchising infoBIDS Free BrowsingBIDS Oil and GasBIDS Terms and ConditionsBIDS loginBIDS tendering











Addenda Details

Central Health

Tender Number: Furniture and Equipment
Revision #: 1
Entry Date: 2019-03-11
Issue Date: 2019-03-11
Close Date: 2019-03-28
Close Time: 1400
Attachments: No

Addenda
Request for Proposals {RFP}
Furniture and Equipment, Long Term Care
60 Bed Unit – Grand Falls Windsor, NL
20 Bed Extension – Botwood, NL
60 Bed Unit - Gander, NL
March 11, 2019 Addendum# 1 Page 1 of 2
FORM OF ADDENDUM
1.
PRECEDENCE
Addenda shall form an integral part of the Specification and to be read in conjunction therewith. Addenda shall take precedence over all forms of the aforementioned Specifications and Drawings with which it may
prove to be at variance or may otherwise be qualified in writing by authorized personnel.
2. GENERAL
The General Conditions and all documents issued with this Specification shall apply and govern all phases of the Work
covered by Addenda.
Contractors are advised to acknowledge receipt of all Addenda on Page 3, Item 9 of the Tender Form when submitting a bid.
3. PURPOSE
The Purpose of this Addenda is to inform bidders of clarifications,
changes and additions to the Contract Documents and Drawings.
1. Addenda
.1 Add addendum # 1 to your list of addenda
2. Section 3.1 Appendix D – Scope of Services
.1 DELETE all references to this appendix D in the RFP; Scope
of work is as per section 1.2
3. Section 1.1 – Background
.1 DELETE in its entirety the comment “There is a need in Central Health for an additional”
4. Section 7.4 Mechanical & Electrical Consultant’s Experience &
Qualifications”
.1 DELETE in its entirety; note to proponents that team must work with M&E Consultant’s and Central Health to confirm that equipment selected can be supported by the infrastructure of the facility.
Request
for Proposals {RFP}
Furniture and Equipment, Long Term Care
60 Bed Unit – Grand Falls Windsor, NL
20 Bed Extension – Botwood, NL
60 Bed Unit - Gander, NL
March 11, 2019 Addendum# 1 Page 2 of 2
5. Section 7.5 Completeness of
the Team
.1 Replace with “if required Furniture and Equipment Consultant will hire additional
sub consultants to successfully implement this proposal and identify the same in
the response.
END OF ADDENDUM # 1