Addenda Details

Eastern Health

Tender Number: 2019-4614
Revision #: 3
Entry Date: 2019-06-11
Issue Date: 2019-06-11
Close Date: 2019-06-27
Close Time: 1400
Attachments: No

Addenda
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Closing Date change from NO DATE
to Jun/27/2019
Previously issued in on NO DATE

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

ADDENDUM # 3
Tender #2019-4614
Multi-Site Water Treatment Services
This Addendum shall form an integral part of the specification to be read in conjunction therewith. This Addendum shall take precedence over all forms of the
aforementioned specification with which it may prove to be at variance or may otherwise be qualified in
writing by authorized personnel.
TENDER CLOSING:
The Tender Closing has been changed and will now close on Thursday,
June 27, 2019 at 14:00:00 Hours (2:00:00 PM) (Newfoundland Time) and open at 14:30:00 Hours (2:30 PM) (Newfoundland Time).
QUESTIONS/ANSWERS
Question 1:
As per schedule 1 all the chemical pumps, the boiler controllers, the
cooling tower controllers, dissolving boards, containment tanks and condensate coupon racks are not owned by Eastern Health and MUST be replaced as part of the quarterly pricing per site?
Answer 1:
Correct. All equipment is
owned by vendor and must be supplied by successful vendor for the duration of the contract and including in the bid sheet.
Question 2:
In Schedule B – It says to provide pricing in Schedule A – yet the pricing information
section provided is labelled as Schedule 2? Is filling out schedule 2 sufficient or is schedule A missing?
Answer 2:
There was a clerical typo in the original tender; completing schedule 2 is suffice.
Question 3:
Schedule B
– Bid sheet refers to answering questions and specifically refers to yes and no questions? Are some questions missing or is it just referring to the bidders information sheet?
Answer 3:
Yes this is just referring to the
bidders information sheet.
Question 4:
As there is no minimum technical information provided in the tender document, we are requesting an extension to allow us and Eastern Health time to collect and provide the required
information. The information provided is not enough to provide a recommendation for a water treatment program.
Answer 4:
A two week extension was granted.
Question 5:
The required information per application and each
individual site location is detailed below:
 Boiler Systems
Please include the requested information detailed below for the the following boiler sites:
 Waterford Hospital, St. Clare’s Hospital, Dr. L.A
Miller Center, Carbonear General Hospital, Dr. Walter Templeman Health Center, Carbonear Long Term Care, Agnes Pratt Home, Tuckamore Center, DG. G.B Cross Memorial Hospital, Building 532 Pleasantville, Central Kitchen, Burin
Peninsula Health Center
Required Information
 Steam production; provided in lbs of steam (lbs/hr or lbs/yr or lbs/day)
 Operating Pressure (kPa or psi)
 % Condensate Return
 % Make up

Operating Days/ Year
 Make up Water Quality:
o Conductivity (uS/cm) , P Alkalinity (mg/L), M Alkalinity(mg/L), Chloride(mg/L), Hardness(mg/L), Iron(mg/L), Copper(mg/L), Silica(mg/L)
 Cooling Towers
Please
include the requested information detailed below for the following sites with cooling towers:
 St. Clare’s Hospital, Carbonear General. Note these are the only sites listed as having a cooling tower.
Required
Information
 -Recirculation rate (gallons/ minute (GPM) or Liters/hour or Liters/ minute, etc.)
 % operating of full load (example; St Clare’s has 2 towers @ 750 ton, do they operate at 750 ton each or is it
one at a time at 50 % load i.e. 375 ton)
 System Volume (gallons or liters or cubic meter, etc...)
 System Metallurgy (Steel, copper, etc...)
 Full Load Design Delta T (Temperature)
 Make up Wat
Quality:
o pH, Conductivity (uS/cm) , P Alkalinity (mg/L), M Alkalinity(mg/L), Chloride(mg/L), Calcium(mg/L), Iron(mg/L), Copper(mg/L), Silica(mg/L)
 Closed Loop Systems:
Please include the requested information for
the closed loop systems at the following sites:
 St. Clare’s, Dr. L.A Miller Center, Carbonear General Hospital, Dr. Walter Templeman Health Center, Carbonear Long Term Care, Agnes Pratt Home, Tuckamore Center, Burin
Peninsula Health Center, Dr. G.B. Cross Memorial Hospital, Grand Bank Health Center, Golden Heights Manor, Dr. A.A. Wilkinson Hospital, St. Luke’s Home, Pleasantview Towers, Central Kitchen, Nuclear and Molecular
Medicine
Required Information
 System Metallurgy (Steel, Cooper, etc...)
 Cooling Medium (Water or Glycol, etc...)
 System Volume (gallons or liters or cubic meters)
 Flow rate (gallons/ minute/
or liters/ minute, etc...)
Answer 5:
As per section 3.1 of the tender, opportunity was provided for bidders to survey each site/plant to gather data as referenced in question 5. Adequate time was provided.
Issued: June 11,
2019